Project Details

24th Avenue & Camelback Road Detention Basin & Storm Drain

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

There are no previous public meetings for this project.
Project Contact: Don Rerick
Region: N
District: 3 - Andy Kunasek

This project is the result of modifications that were made to the 24th Avenue & Camelback Basin and Storm Drain project. A drainage study prepared by the City of Phoenix in 2003 identified flooding problems in the vicinity of 24th Avenue and Camelback Road. The study recommended construction of four basins and associated storm drains to collect and dispose of the floodwater. Because of budgetary constraints the project was modified to include a single basin in the vicinity of 24th Avenue and Camelback Road and associated storm drains. The basin is designed to contain runoff from a greater than 2-year storm event. Phoenix was the lead agency for all design and construction-related tasks for the project.


The project is complete, and owned, operated and maintained by the City of Phoenix.

Send us your questions or comments about this project.