Project Details

Casandro Wash Dam and Outlet

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

There are no previous public meetings for this project.
Project Contact: Thomas Renckly
Region: NW
District: 4 - Clint L. Hickman
Description:

Casandro Wash Dam was constructed to collect and store water from the Casandro Wash, removing a significant number of residential structures from the 100-year floodplain in a three-square-mile area east of the structure. The dam is 350 feet in length and the emergency spillway is an 80-foot-wide concrete weir through the embankment near the center of the dam. Casandro Wash Dam was constructed by the District which is also responsible for the operation and maintenance of the structure excluding the outfall system, which is maintained by the Town of Wickenburg.

Operation and Maintenance: Flood Control District, Town of Wickenburg
Resolution #: 93-04
IGA #: FCD93009

Status:

The project was completed in 1996.



Send us your questions or comments about this project.