Project Details

35th Ave. and Dobbins Rd. Basin and Storm Drain

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

There are no previous public meetings for this project.
Project Contact: Tim Murphy
Region: S
District: 5 - Steve Gallardo
Description:

The District's South Phoenix/Laveen Area Drainage Master Study identified the need for a detention basin at the intersection of 35th Avenue and Dobbins Road. The City of Phoenix intended to utilize the area as a public golf course, so it was determined that implementing a joint use basin and recreational facility would be the most cost effective solution. The 100-year basin drains through a storm drain constructed along 39th Avenue which outlets to the Baseline Road Storm Drain.

The City of Phoenix acted as the lead agency for project construction and shared costs with the District.

Operation and Maintenance: City of Phoenix
Resolution #: 93-18
IGA #: FCD 97001

Status:

The project is complete.



Send us your questions or comments about this project.