Project Details

Cave Creek Dam (Historic)

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

There are no previous public meetings for this project.
Project Contact: Thomas Renckly
Region: N
District: 3 - Andy Kunasek
Description:

Cave Creek Dam was built in 1923 and is a reinforced concrete barrel arch structure. In 1979, the U.S. Army Corps of Engineers built the earthen Cave Buttes Dam just downstream of Cave Creek Dam to replace Cave Creek Dam. A channel was excavated around the right abutment of Cave Creek Dam to allow equalization of the flood pools. The older Cave Creek Dam no longer provides flood protection but was preserved due to its historic significance.

The dam is maintained by the District.

Status:

The dam was constructed in 1923 and effectively replaced in 1979.



Send us your questions or comments about this project.