Project Details

Arcadia Lafayette Interceptor Drain & Outlet

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

There are no previous public meetings for this project.
Project Contact: Bobbie Ohler
Region: Central
District: 3 - Andy Kunasek
Description:

In 1997, the District completed its Arcadia Area Drainage Project study. The study, and later the Metro Area Drainage Master Plan, recommended a series of storm drains in the Arcadia area intended to reduce flooding hazards resulting from Camelback Mountain stormwater runoff and ponding against the Arizona Canal. The Lafayette Interceptor Drain will likely be the first of these facilities to be implemented.

The Project, which may be phased, will include a storm drain along 40th Street north of Camelback Road, a storm drain along Lafayette Boulevard between Camelback Road and Arcadia Drive, and an outlet along Arcadia Drive from Lafayette Boulevard to the improved Old Cross Cut Canal.

Status:

Design is expected to begin in the summer of 2010.



Send us your questions or comments about this project.