Project Details

Rodger Creek Floodplain/Floodway Delineation Study

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

• 7/28/2011
Project Contact: Catherine Regester
Region: NE
District: 3 - Andy Kunasek
Description:

The purpose of this project is to perform a detailed floodplain/floodway delineation along Rodger Creek from the confluence with Skunk Creek to approximately 2.3 miles east of 24th Street. The study will use detailed topographic mapping, hydrology, and hydraulic analyses to re-evaluate the extent of floodprone areas along Rodger Creek. The results will be a re-delineation of the existing floodplain/floodway.

Status:

This project is completed.

Available Documents

Document Name Type Size
Annotated FIRM Panel 0395H PDF 3.23 MB
Annotated FIRM Panel 0415H PDF 2.37 MB
Annotated FIRM Panel 0780H PDF 2.80 MB
Annotated FIRM Panel 07850H PDF 2.69 MB
Annotated FIRM Panel 0785H-2 PDF 2.77 MB
Floodplains & Floodways Under Review PDF 5.7 MB
Project Announcement Brochure PDF 2.97 MB


Send us your questions or comments about this project.