115th Avenue and Union Hills Drive Drainage Improvements Project

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

• 11/5/2014
• 3/27/2014
Project Contact: Bobbie Ohler
Region: NW
District: 4 - Clint L. Hickman
Phase: Construction
Description:

The 115th Avenue and Union Hills Drive Drainage Improvement Project is a partnership between the Flood Control District of Maricopa County (District), the City of Peoria (Peoria), the City of Surprise (Surprise) and the Maricopa County Department of Transportation (MCDOT). The project includes approximately two miles of storm drains, basin improvements, channel improvements, maintenance roads adjacent to the project, and associated structures and features.

The main goal of the project is to intercept flood water that enters the project area from the northeast and convey the water to the Agua Fria River via existing and improved channels and/or storm drains. The project is designed for the 100-year storm event.

The project is located within the City of Peoria, City of Surprise and unincorporated Maricopa County. The project begins at Beardsley Road and 107th Avenue and ends south of Bell Road at the Agua Fria River.

The project is divided into three phases:

Phase 1

Improve the existing Sun City Drain along 115th Avenue from Agua Fria River to Bell Road as needed; widen the channel at the northeast corner of 115th Avenue and Bell Road to ensure the 100-year flood flows travel under the road; improve the channel drainage along 115th Avenue from Bell Road to Union Hills Drive; and add storm drains and catch basins at the intersection of 115th Avenue and Union Hills Drive and north along 115th Ave. to Doodah Lane.

Phase 2

Add a storm drain system along Union Hills Drive from 111th Avenue to 107th Avenue and along 107th Avenue (outletting to the Canyon Ridge Channel); add a storm drain system along 107th Avenue from Union Hills Drive to Palm Tree Drive; and improve the existing basins at the northwest and northeast corners of Union Hills Drive and 111th Avenue.

Phase 3

Improve the existing earthen channel along Beardsley Road from 115th Avenue to 111th Avenue; add a storm drain system along 115th Avenue from Union Hills Drive to Beardsley Road; and add a split flow junction structure at the northeast corner of Beardsley Road and 115th Avenue.

Status:

Design and construction IGA's are in place among the Flood Control District, City of Peoria, City of Surprise, and MCDOT. The Design contract was awarded to Ritoch-Powell & Associates, and Phase 1 and Phase 2 designs have been completed. Phase 1 and Phase 2 were combined into one contract, and the contract was awarded to Degan Construction, LLC. Construction began in February 2017 and is anticipated to be completed in the summer of 2018. Utility relocations along Union Hills Drive, 111th Avenue, and 107th Avenue, are anticipated to begin in June 2017. For more information, call our 24-hour construction hotline at (602) 264-6416.

Available Documents

Document Name Type Size
03-2014 Project Newsletter PDF 3.7 MB
03-2014 public open house exhibit boards PDF 13.32 MB
04-2013 - IGA approved news release PDF 178 KB
09-2014 PAAC Rainwater Harvesting PDF 2.05 MB
09-2014 PAAC Structural Aesthetics Bell Road PDF 2.23 MB
09-2014 PAAC Structural Aesthetics Custom PDF 2.31 MB
09-2014 PAAC Structural Aesthetics Railing PDF 1.13 MB
09-2014 PAAC Structural Aesthetics Standard PDF 6.07 MB
09-2014 PAAC Structural Aesthetics Variations PDF 5.95 MB
11-2014 Project Brochure PDF 3.57 MB
March 2017 Construction Newsletter PDF 290 K
May 2017 Update PDF 230 K
Project Map PDF 3.26 MB
Road Closure Advisory PDF 4.5 MB


Send us your questions or comments about this project.