Project Details

North Gilbert Hydrology Update

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

• 4/5/2016
Project Contact: Kathryn Gross
Region: SE
District: 1 - Denny Barney 2 - Steve Chucri
Phase: Floodplain Delineation
Description:

The Flood Control District of Maricopa County (District), in cooperation with the Town of Gilbert, is conducting the North Gilbert Hydrology Update to update the hydrology within the northern portion of the Town of Gilbert. This project will update the hydrology for approximately 20 square miles and will become the basis of a Letter of Map Revision along the Consolidated Canal between Guadalupe Road and the Union Pacific Railroad and along the Union Pacific Railroad between Gilbert Road and the Western Canal.

The study area is located within the Town of Gilbert in southeast Maricopa County and is generally bounded on the west and south by the Union Pacific Railroad and on the north by Guadalupe Road and the east by Lindsay Road.

Once the study is complete, impacted property owners will be notified and invited to a public meeting to review its results. The study results will then be submitted to the Federal Emergency Management Agency (FEMA) for review, approval and incorporation onto the Flood Insurance Rate Maps (FIRMs). It typically takes approximately 9 months to a year for FEMA to process a study of this size. In the interim, the study information will be used as “best available data” until the FIRMs are updated.

Status:

The study is underway and anticipated for completion in February 2016.

Available Documents

Document Name Type Size
Letter of Map Revision Determination Document PDF 2.8 MB
NorthGilbertFloodMap .pdf 3.4 MB
Public Meeting Announcement (April 5, 2016) pdf 768 K


Send us your questions or comments about this project.