Description:

The Powerline FRS and IDSM will be replaced with an earthen flood control channel (Powerline Channel) designed for the 100-year flood event and to direct the flows from the channel to the Vineyard Road FRS flood pool. The purpose and need of the project is to provide continued flood protection for the downstream benefitted area and to reduce the risk of loss of life due to catastrophic dam failure. Action is needed to address public safety issues surrounding a flood control dam that does not meet existing safety and performance standards for a high hazard potential structure.

Status:

Project is currently in the 90% design stage. Final PS&E for the project is expected to be complete during the summer of 2018.

Available Documents

Document Name Type Size
Project Location Map PDF 5.4MB


Send us your questions or comments about this project.