27th Avenue and Olney Avenue

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

There are no previous public meetings for this project.
Project Contact: Nazar Nabaty
Region: SW
District: 5 - Steve Gallardo
Phase: Design & Engineering
Description:

The District conducted the Laveen Area Drainage Master/Plan Update (ADMP/U) to develop and evaluate solutions to mitigate flooding hazards in the Laveen Area. This project is one of the recommend solutions from the ADMP/U to reduce the impacts from flooding. This project consists of the design and construction of a storm drain along Olney Avenue from west of 23rd Avenue to 27th Avenue, and then extending to the north along 27th Avenue all the way to South Mountain Avenue. The storm drain will outfall into the existing City of Phoenix basin located at the northeast corner of 27th and South Mountain Avenues. The project also includes the design and construction of three retention basins along 23rd Avenue south of Olney. The District will be the lead agency for the design and construction of the project and the City of Phoenix will contribute 50% of the project’s costs. Portions of the project are located within the City of Phoenix and portions are located in unincorporated Maricopa County.

Status:

The District is working with a consultant to begin the final design of this project. Design of the basins is the top priority and will be completed in 2019. The City of Phoenix will take the lead on the construction, and it will start closely following completion of the design. The design of the storm drain system will be done separately and should be completed by the end of 2019.



Send us your questions or comments about this project.