Project Details

Rawhide Wash Flood Hazard Mitigation Project

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

There are no previous public meetings for this project.
Project Contact: Bobbie Ohler
Region: NE
District: 2 - Steve Chucri
Phase: Design & Engineering
Description:

The Rawhide Wash Flood Hazard Mitigation Project was identified as an important project in the Pinnacle Peak West Area Drainage Master Study. An alternatives analysis was completed in June 2016, and it was determined to go forward with the Conveyance alternative. The City of Phoenix and City of Scottsdale both submitted the Project for the 2018 CPPP and it was approved by the Flood Control Advisory Board on October 25th, 2017. The Project Resolution was approved by the Board of Directors on April 11, 2018. The Flood Mitigation Project will certify existing floodwalls and levies, make improvements as needed to certify existing walls and levees, and add new walls and levies along Rawhide Wash between Pinnacle Peak Road and Jomax Road, in order to capture and convey the 100-year flood.

Status:

Design for the project will begin in the Fall of 2018 and is expected to finish in the Fall of 2019. Construction to begin in 2020.

Available Documents

Document Name Type Size
Overview Map PDF 2 MB


Send us your questions or comments about this project.