Project Details

Siphon Draw Drainage Improvements

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

• 7/16/2008
Project Contact: Bobbie Ohler
Region: SE
District: 2 - Steve Chucri
Description:

This project is part of the East Mesa Area Drainage Master Plan and includes a channel along Meridian Road to intercept flow entering Maricopa County from Pinal County and one detention basin constructed east of Meridian Road to intercept 100-year flows from Siphon Draw Wash and the channel. This basin detains flows, and outlets back to the Siphon Draw Wash, which outlets to the existing drain system at Elliot Road and 104th Avenue. The project implementation was cost-shared between the city of Mesa and the District.

Status:

Construction is now complete, and the District owns and maintains the project.



Send us your questions or comments about this project.