Project Details

Bullard Wash, Phase II

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

• 10/21/2003
• 8/13/2002
Project Contact: Don Rerick
Region: SW
District: 4 - Clint L. Hickman
Phase: Design & Engineering
Description:

This is a joint project between the City of Goodyear and the Flood Control District. Bullard Wash is included within the Loop 303 Corridor/White Tanks Area Drainage Master Plan (ADMP), which recommends improvements be made to the wash. Phase I of the Bullard Wash Improvements Project has been completed and included construction of an earthen and gabion basket -lined channel from the Gila River to Lower Buckeye Road.

Phase II includes an earthen/greenbelt channel along the Bullard Wash alignment, which is located between Estrella Parkway and Bullard Avenue, from Lower Buckeye Road to Interstate 10. Landscaping, fencing and other multi-use facilities are anticipated along the channel alignment.

The project will channelize the 100-year floodplain north of the Phoenix-Goodyear Airport. It will reduce the floodplain width and will mitigate flooding to the Phoenix-Goodyear Airport and nearby development. This stormwater would otherwise collect in streets, businesses, farm fields, and residential areas.

Status:

Construction plans have been prepared and the project is on hold pending funding availability and interest by the City of Goodyear to implement the next phases.

Available Documents

Document Name Type Size
Greenbelt Channel Treatment Description PDF 328 KB
Newsletter - August 2002 PDF 493 KB
Newsletter - October 2003 PDF 1.2 MB
Open House August 13, 2002 PDF 383 KB
Phase II (back) PDF 722 KB
Project Area - General Project Information PDF 362 KB


Send us your questions or comments about this project.