Project Details

Bullard Wash, Phase II

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

• 10/21/2003
• 8/13/2002
Project Contact: Scott Vogel
Region: SW
District: 4 - Clint L. Hickman
Phase: Design & Engineering
Description:

This is a joint project between the City of Goodyear and the Flood Control District. Bullard Wash is included within the Loop 303 Corridor/White Tanks Area Drainage Master Plan (ADMP), which recommends improvements be made to the wash. Phase I of the Bullard Wash Improvements Project has been completed and included construction of an earthen and gabion basket -lined channel from the Gila River to Lower Buckeye Road.

Phase II includes an earthen/greenbelt channel along the Bullard Wash alignment, which is located between Estrella Parkway and Bullard Avenue, from Lower Buckeye Road to Interstate 10. Landscaping, fencing and other multi-use facilities are anticipated along the channel alignment.

The project will channelize the 100-year floodplain north of the Phoenix-Goodyear Airport. It will reduce the floodplain width and will mitigate flooding to the Phoenix-Goodyear Airport and nearby development. This stormwater would otherwise collect in streets, businesses, farm fields, and residential areas.

Status:

Construction plans have been prepared and the project is on hold pending funding availability.

Available Documents

Document Name Type Size
Greenbelt Channel Treatment Description PDF 328 KB
Newsletter - August 2002 PDF 493 KB
Newsletter - October 2003 PDF 1.2 MB
Open House August 13, 2002 PDF 383 KB
Phase II (back) PDF 722 KB
Project Area - General Project Information PDF 362 KB


Send us your questions or comments about this project.