Project Details

83rd Avenue and Pinnacle Peak Road Drainage Improvements

Public Meetings

Currently there are no public meetings scheduled for this project.

Past Public Meetings

• 11/2/2005
• 11/8/2004
Project Contact: Scott Vogel
Region: NW
District: 4 - Clint L. Hickman
Description:

This project was identified in the Glendale/Peoria Area Drainage Master Plan Update.

Prior to construction of the project, runoff from the Sunrise Mountains flowed south to Deer Valley Road, between 91st and 83rd Avenues, as sheet flow through neighborhoods with unimproved streets and very few local drainage features. The project included the construction of two detention basins (the Pinnacle Peak Basin at the northwest corner of 83rd Avenue and Pinnacle Peak Road, and the Avenida del Sol Basin at the southeast corner of Avenida del Sol and 87th Avenue); 100-year storm drain along Calle Lejos, 87th Avenue, 83rd Avenue, and Pinnacle Peak Road; and 10-year storm drain along Cielo Grande, Avenida del Sol and Pinnacle Peak Rd. The project was designed to provide 100-year protection to the area between Calle Lejos and Deer Valley Roads, and approximately 87th to 83rd Avenues and 10-year protection between 87th and 91st Avenues. The project was implemented through cooperation between the City of Peoria, the Maricopa County Department of Transportation and the District.

Status:

Construction is complete, and the project is owned, operated and maintained by the City of Peoria.