Project Name: Gila Bend Drainage Improvements

117

Project Manager: Tim Murphy
Contact by phone at (602) 506-4605 or by email

Project is in Supervisor District:

  • District 1: False
  • District 2: False
  • District 3: False
  • District 4: False
  • District 5: True

You can find your Supervisor District by clicking here.

Project Type: Engineering/Design

Project Description:

The Gila Bend Drainage Improvement Project area is located within the Town of Gila Bend approximately bounded by Scott Avenue Wash on the west, Bender Wash on the east and from approximately Indian Road on the north to I-8 to the south.  The proposed improvements were identified in the Gila Bend Area Drainage Master Plan Update as being a necessary component to control flooding in the area.  Once implemented, this project will reduce the flood hazard by constructing a series of levees, channels, basins and other drainage improvements in the area.

Last Updated: 2/2/2023 8:10:57 AM


Project Updates

Project in design
Posted On: 2/2/2023 8:10:57 AM

The preliminary design for the project is underway by the consultant.  As part of the design process, the consultant team has started the data collection and field investigation activities for utility locations and soil sampling.