Projects
Project Name: Gila Bend Drainage Improvements
117
Project Manager: Tim Murphy
Contact by phone at (602) 506-4605 or by email
Project is in Supervisor District:
- District 1: False
- District 2: False
- District 3: False
- District 4: False
- District 5: True
You can find your Supervisor District by clicking here.
Project Type: Engineering/Design
Project Description:
The Gila Bend Drainage Improvement Project area is located within the Town of Gila Bend approximately bounded by Scott Avenue Wash on the west, Bender Wash on the east and from approximately Indian Road on the north to I-8 to the south. The proposed improvements were identified in the Gila Bend Area Drainage Master Plan Update as being a necessary component to control flooding in the area. Once implemented, this project will reduce the flood hazard by constructing a series of levees, channels, basins and other drainage improvements in the area.
Last Updated: 2/2/2023 8:10:57 AM
Project Updates
Project in design
Posted On: 2/2/2023 8:10:57 AM
The preliminary design for the project is underway by the consultant. As part of the design process, the consultant team has started the data collection and field investigation activities for utility locations and soil sampling.
Public Meetings
There are no public meetings scheduled.
Project Documents
Document Name | Description | Document Type | Filesize | Posted On | |
---|---|---|---|---|---|
There are no documents attached for this project. |