Project ListProject Map

Projects

Project Name: East Maricopa Floodway Low Flow Channel - Germann

59

Project Manager: Unknown
Contact by phone at or by email

Project is in Supervisor District:

  • District 1: False
  • District 2: False
  • District 3: False
  • District 4: False
  • District 5: False

You can find your Supervisor District by clicking here.

Project Type: Construction

Project Description:

This project constructs a concrete low flow channel within the existing, grass-lined East Maricopa Floodway, extending from Germann Road at the downstream end to Power Road at the upstream end.

The slope of the existing channel is very flat, resulting in ponding of water and muddy conditions.  Concerns about mosquitos been received from adjacent neighborhoods.

The purpose of the concrete low flow channel is to eliminate most of the ponding and muddy conditions, facilitate sediment and debris removal and other maintenance activities.

Last Updated: 8/16/2022 8:38:20 AM


Project Updates


Posted On: 3/24/2021 11:23:55 AM

This project is now complete and all the disturbed areas of the channel have been treated with hydro-mulch to help prevent erosion.


Public Meetings

There are no public meetings scheduled.


Project Documents

Document Name Description Document Type Filesize Posted On  
There are no documents attached for this project.