Project ListProject Map

Projects

Project Name: Cudia City Wash DCR

82

Project Manager: Lana Nabaty
Contact by phone at (602) 506-5537 or by email

Project is in Supervisor District:

  • District 1: False
  • District 2: False
  • District 3: True
  • District 4: False
  • District 5: False

You can find your Supervisor District by clicking here.

Project Type: Study

Project Description:

Sign up for our project mailing list

The Cudia City Wash Area Drainage Master Study is a restudy of the 1994 ACDC ADMS Phase I covering the watershed area between Cudia City Wash and 10th St. Wash. The study area is approximately 13 square miles located primarily within the Town of Paradise Valley, City of Phoenix and a small portion of unincorporated Maricopa County.

This project will prepare a Design Concept Report (DCR) for Cudia City (Echo Canyon) Wash zone 4 as identified in the Cudia City Wash ADMS. The DCR area covers approximately four-square miles located within Paradise Valley and City of Phoenix. The area is mainly residential with some commercial corridors along major roadways. The District will be working on the following tasks in this phase:

  • Evaluate FEMA floodplains within this watershed for potential redelineation
  • Further technical analysis of the proposed alternatives from ADMS phase
  • Develop 15% plans associated with cost estimates and reports to mitigate the flood hazards reducing flood risks

Review ADMS hydrological model data here

Last Updated: 4/9/2021 8:24:00 AM


Project Updates

There a currently no updates to this project.


Public Meetings

Meeting Title: Virtual Public Presentation & Public Comment Period

Meeting Description:

A virtual public presentation and comment period for the Cudia City Wash DCR is available from April 12th to April 26th. The presentation describes improvement alternatives for the Cudia City Wash zones and provides an opportunity for your comments, questions, and preferences.

Meeting Location: Online

Address:
Online

City:

Zip:

Meeting Date:
2021-04-26

Meeting Time:

Meeting Is Webinar: 0

Meeting Link:

Meeting Link:

Meeting ID:

Special Instructions to Connect:

Does this meeting have a pre-recorded video? 1

Video Link:

Video Survey:
The survey will be available until 4/26/2021 12:00:00 AM


Project Documents

Document Name Description Document Type Filesize Posted On  
Project Fact Sheet Project Fact Sheet for the Cudia City Wash Design Concept Report. PDF .5 3/31/2021 8:13:30 AM View