Project ListProject Map

Projects

Project Name: White Tanks FRS No. 3 Outfall Channel Access Road

94

Project Manager: Erik Arntz
Contact by phone at (602) 506-4714 or by email

Project is in Supervisor District:

  • District 1: False
  • District 2: False
  • District 3: False
  • District 4: True
  • District 5: False

You can find your Supervisor District by clicking here.

Project Type: Construction

Project Description:

Originally constructed in 2013, the White Tanks No. 3 Outfall Channel conveys stormwater from the White Tanks Flood Retarding Structure to the downstream structure. It runs parallel to Jackrabbit Trail corridor playing an integral part of an important West Valley flood control system.

The project provides a safe and reliable access road to the outfall channel for District operations and maintenance activities. With future intentions to widen Jackrabbit Trail, the existing access road will soon be restricted. The new 16-foot wide access road will run approximately one-half mile long from Indian School Road to Osborn Road. 

PROJECT SCHEDULE
Final Design: September 2020 - January 2021
Construction: Spring 2021

  • Existing trees will be removed to allow for the access road along the District property line
  • Construction equipment will be in the vicinity of the project for approximately one month
  • Traffic may be minorly impacted on Clarendon Avenue and Osborn Road

Last Updated: 2/24/2021 11:45:11 AM


Project Updates

There a currently no updates to this project.


Public Meetings

There are no public meetings scheduled.


Project Documents

Document Name Description Document Type Filesize Posted On  
White Tanks #3 Outfall Channel West Access Road Improvements Public Outreach for the construction of an access road on the White Tanks #3 Outfall Channel PDF 13 11/13/2020 2:20:16 PM View