Project Name: Sun City Drains Reconstruction

95

Project Manager: Frank Hakari
Contact by phone at (602) 506-2943 or by email

Project is in Supervisor District:

  • District 1: False
  • District 2: False
  • District 3: False
  • District 4: True
  • District 5: False

You can find your Supervisor District by clicking here.

Project Type: Construction

Project Description:

The Project will re-construct the 1,500 ft. long channel along the north side of Olive Ave, from 103rd Ave to 99th Ave. The existing lining, built in the 1960s, is in a distressed condition and will be removed and replaced with a rectangular, reinforced concrete lining.  The project improvements also include a maintenance access ramp to the channel bottom, safety railing, and perimeter fencing.

Last Updated: 1/24/2023 3:44:06 PM


Project Updates

Project Status
Posted On: 5/24/2022 8:17:44 AM

Construction is complete. 

Project Status
Posted On: 2/10/2022 3:51:40 PM

Project Construction is complete as of November 2021. 


Public Meetings

There are no public meetings scheduled.


Project Documents

Document Name Description Document Type Filesize Posted On  
Sun City Drains Construction Notice Flyer sent to area residents. PDF 3/5/2021 2:53:00 PM View